Every mechanical failure has a warning period before it happens, reliability engineers call it the P-F interval, the span between the point a piece of equipment first shows a detectable sign of degradation (P, potential failure) and the point it actually stops working (F, functional failure). For a pump bearing, that interval might run for […]